Implementing technology infrastructure for the new ČEZ Company datacentre in Bulgaria.

Solution Implemented

  • detailed discussion of energy and thermal balance sheets for given buildings at a given location
  • proposal of modular, scalable solutions and setting the power frame of 250kVA by two modules with a nominal output of 50kVA
  • proposal of hall air conditioning unit and cooling distribution system
  • proposal for air conditioning unit for UPS room and operators room
  • delivery of technologies and racks

Added Value of the Solution

  • backup sources (UPS), air conditioning systems, air conditioning and racks for the datacentre have been supplied by the ALTRON Company
  • provision of logistics and coordination of implementation activities with local companies provided by the ALTRON Company
  • complex solution for UPS nonstop monitoring system and air conditioning units on the basis of their own PROMAN™ system has been supplied by the ALTRON Company